T479 - PPG Envirobase High Performance Body Paint Aluminum Silver Dollar Coarse 1L
Regular price
100,50€ excl. VAT
Sale price
100,50€ excl. VAT
-
In stock- Expected delivery on
100% secure payment
Payment methods
Couldn't load pickup availability
Technical characteristics Aluminium Dollar Silver Coarse T479 PPG
- Reference: T479-E1
- Range: Envirobase High Performance
- Shade: Aluminium Dollar Silver Coarse
- Content: 1 Litre
- Mixing ratios (by volume):
- Opaque shades: 100:10 with thinner T494/T495
- Mica shades: 100:20 with thinner T494/T495
- Metallic shades: 100:20 to 30 with thinner T494/T495
- Choice of thinner:
- Temperature below 35°C: T494
- Temperature above 35°C: T495
- Spraying:
- spraygun HVLP
- Recommended nozzle: 1.2 mm to 1.4 mm
- Application pressure: 2 to 2.2 bars
- Application method:
- Apply a first uniform coat
- After complete drying, apply a second coat
- Apply a placement coat on dry film (except opaque shades)
- Evaporation time before clears: minimum 15 minutes, maximum 24 hours
Properties and advantages
- Metallic base containing innovative pigments compatible with the Envirobase system
- Excellent opacity from the first application
- Easily mixable with other shades in the range
- Homogeneous and flawless final finish
- Possibility to optimize mixes with the automated weighing system MOONWALK™
- Water-dilutable formula with low VOC content, compliant with environmental standards
- Reduction of solvent emissions and waste
Recommended applications
- Reproduction of manufacturer metallic shades
- Repairs on partial elements or complete assemblies
- Compatible with the entire Envirobase High Performance system
Instructions for use
- Carefully prepare the surface (sanding, degreasing, dust removal)
- Mix the shade according to the recommended ratios with the appropriate thinner
- Use an HVLP spraygun equipped with a 1.2 mm to 1.4 mm nozzle
- Recommended spraying pressure: 2 to 2.2 bars
-
In Standard Process:
- Apply the first coat
- Let dry completely
- Apply the second coat
- Finish with a placement coat on dry film (except opaque shades)
-
In Express Process:
- Apply successive light coats until opacity
- Finish with a placement coat on dry film (except opaque shades)
- Let dry 15 minutes before applying the clears
Photo non contractuelle
Technical Specifications
Technical Specifications
Technical characteristics Aluminium Dollar Silver Coarse T479 PPG
- Reference: T479-E1
- Range: Envirobase High Performance
- Shade: Aluminium Dollar Silver Coarse
- Content: 1 Litre
- Mixing ratios (by volume):
- Opaque shades: 100:10 with thinner T494/T495
- Mica shades: 100:20 with thinner T494/T495
- Metallic shades: 100:20 to 30 with thinner T494/T495
- Choice of thinner:
- Temperature below 35°C: T494
- Temperature above 35°C: T495
- Spraying:
- spraygun HVLP
- Recommended nozzle: 1.2 mm to 1.4 mm
- Application pressure: 2 to 2.2 bars
- Application method:
- Apply a first uniform coat
- After complete drying, apply a second coat
- Apply a placement coat on dry film (except opaque shades)
- Evaporation time before clears: minimum 15 minutes, maximum 24 hours
Properties and advantages
- Metallic base containing innovative pigments compatible with the Envirobase system
- Excellent opacity from the first application
- Easily mixable with other shades in the range
- Homogeneous and flawless final finish
- Possibility to optimize mixes with the automated weighing system MOONWALK™
- Water-dilutable formula with low VOC content, compliant with environmental standards
- Reduction of solvent emissions and waste
Recommended applications
- Reproduction of manufacturer metallic shades
- Repairs on partial elements or complete assemblies
- Compatible with the entire Envirobase High Performance system
Instructions for use
- Carefully prepare the surface (sanding, degreasing, dust removal)
- Mix the shade according to the recommended ratios with the appropriate thinner
- Use an HVLP spraygun equipped with a 1.2 mm to 1.4 mm nozzle
- Recommended spraying pressure: 2 to 2.2 bars
-
In Standard Process:
- Apply the first coat
- Let dry completely
- Apply the second coat
- Finish with a placement coat on dry film (except opaque shades)
-
In Express Process:
- Apply successive light coats until opacity
- Finish with a placement coat on dry film (except opaque shades)
- Let dry 15 minutes before applying the clears
Photo non contractuelle
Customer reviews
Customer reviews

