Skip to content

+33 (0)1 48 17 05 19
at your service from 8 AM to 6 PM

T458 - PPG Envirobase High Performance Body Paint Pearl Blue Green 0.5L

Technical characteristics Pearl Blue Green T458 PPG

  • Reference: T458/E5
  • Range: Envirobase High Performance
  • Shade: Pearl Blue Green
  • Content: 0.5 Liter
  • Mixing ratios (by volume):
    • Opaque shades: 100:10 with thinner T494/T495
    • Mica shades: 100:20 with thinner T494/T495
    • Metallic shades: 100:20 to 30 with thinner T494/T495
  • Choice of thinner:
    • Temperatures below 35°C: T494
    • Temperatures above 35°C: T495
  • Spraying:
    • HVLP spraygun
    • Recommended nozzle: 1.2 mm to 1.4 mm
    • Application pressure: 2 to 2.2 bars
  • Application method:
    • Apply a first uniform coat
    • After complete drying, apply a second coat
    • Apply a placement mist on dry film (except opaque shades)
  • Evaporation time before clears application: minimum 15 minutes, maximum 24 hours

Properties and advantages

  • Pearl Blue Green shade with intense and homogeneous effect
  • High-quality pigments for durable and resistant finish
  • Compatible with Envirobase High Performance systems
  • Water-dilutable formula with low VOC emissions
  • Simple application without special additives
  • Reduced drying time: 15 minutes before clears application

Recommended applications

  • Reproduction of pearl blue-green shades on bodywork
  • Partial or complete repairs requiring a compliant pearl effect
  • Compatible with Envirobase High Performance water-dilutable bases

Instructions for use

  • Surface preparation:
    • Dust off the surface with an air blower
    • Degrease with a clean cloth and suitable cleaner (example: D837 PPG)
  • Shade preparation:
    • Mix the shade with auxiliary products according to the technical data sheet ratios
    • Filter the mixture with a 125 µm cone to remove impurities
  • Equipment setup:
    • HVLP spraygun, nozzle 1.2 mm to 1.3 mm
    • Application pressure: 2 to 2.5 bars
  • Paint application:
    • Apply a first uniform coat
    • Let dry completely
    • Apply a second coat
    • Finish with a placement mist on dry film (except opaque shades)
    • Evaporation time before clears application: minimum 15 minutes, maximum 24 hours

Photo non contractuelle